Saturn 1B: Difference between revisions

From Project Apollo - NASSP
Jump to navigation Jump to search
imported>Swatch
mNo edit summary
imported>Tschachim
m (Reverted edits by 212.72.56.31 (Talk); changed back to last version by Tschachim)
 
(6 intermediate revisions by 4 users not shown)
Line 1: Line 1:
[[Image:Saturn1b on pad.jpg|thumb|right|The Saturn IB on pad]]
[[Image:Saturn1b on pad.jpg|thumb|right|The Saturn IB on pad]]


The Saturn IB (Pronounced 'Saturn One-Bee') was an uprated version of the Saturn I, which featured a much more powerful second stage, the S-IVB. Unlike the earlier Saturn I, the IB had enough throw weight to launch the Apollo Command/Service Module or [[Lunar Module]] into Earth orbit, which made it invaluable for testing the Apollo spacecraft while the larger Saturn V needed to send them to the moon was still being developed. The Saturn IB was later used for manned Skylab flights, and the Apollo-Soyuz Test Project. The final production run (such as Skylab launch vehicles) did not have alternating black and white tanks on the first stage that were hallmarks of the earlier runs.
The '''[[w:Saturn_1b|Saturn IB]]''' was used to launch the Apollo 7 mission, ASTP mission and Skylab crew missions<cite>SATURN1B_FLIGHTMAN</cite>.
 
<br clear="right">
 
==Background==
 
The Saturn IB (Pronounced 'Saturn One-Bee') was an uprated version of the Saturn I, which featured a much more powerful second stage, the S-IVB. Unlike the earlier Saturn I, the IB had enough throw weight to launch the Apollo Command/Service Module or [[Lunar Module]] into Earth orbit, which made it invaluable for testing the Apollo spacecraft while the larger [[Saturn V]] needed to send them to the moon was still being developed. The Saturn IB was later used for manned Skylab flights, and the Apollo-Soyuz Test Project. The final production run (such as Skylab launch vehicles) did not have alternating black and white tanks on the first stage that were hallmarks of the earlier runs.


The '''[[w:Saturn_1b|Saturn IB]]''' was used to launch the Apollo 7 mission, ASTP mission and Skylab crew missions<cite>SATURN1B_FLIGHTMAN</cite>.
==Stages==
 
The Saturn IB consisted of an [[S-IB]] stage with eight [[H-1]] engines, and a 200-series [[S-IVB]] stage with a single [[J-2]] engine mounted on top of it. A small interstage on the S-IB separated the two.


<biblio force=false>
<biblio force=false>

Latest revision as of 18:26, 10 October 2007

The Saturn IB on pad

The Saturn IB was used to launch the Apollo 7 mission, ASTP mission and Skylab crew missionsSATURN1B_FLIGHTMAN.


Background

The Saturn IB (Pronounced 'Saturn One-Bee') was an uprated version of the Saturn I, which featured a much more powerful second stage, the S-IVB. Unlike the earlier Saturn I, the IB had enough throw weight to launch the Apollo Command/Service Module or Lunar Module into Earth orbit, which made it invaluable for testing the Apollo spacecraft while the larger Saturn V needed to send them to the moon was still being developed. The Saturn IB was later used for manned Skylab flights, and the Apollo-Soyuz Test Project. The final production run (such as Skylab launch vehicles) did not have alternating black and white tanks on the first stage that were hallmarks of the earlier runs.

Stages

The Saturn IB consisted of an S-IB stage with eight H-1 engines, and a 200-series S-IVB stage with a single J-2 engine mounted on top of it. A small interstage on the S-IB separated the two.

<biblio force=false>

  1. References

</biblio>


This article is a stub. You can help Project Apollo - NASSP by expanding it.