Sequential Events Control Subsystem: Difference between revisions
imported>Mark Grant (ELS and cat) |
imported>Tschachim m (cat) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
The '''Sequential Events Control Subsystem''' (SECS) is responsible for controlling events which must happen in a pre-programmed sequence, for example parachute deployment during landing, or jettisoning the [[Service Module]]. | The '''Sequential Events Control Subsystem''' (SECS) is responsible for controlling events which must happen in a pre-programmed sequence, for example parachute deployment during landing, or jettisoning the [[Service Module]]. | ||
==Launch Escape System== | |||
{{mainarticle|Launch Escape System}} | |||
The Launch Escape System (LES) is responsible for returning the crew safely to Earth in the event of an abort during the launch. If the Launch Escape Tower is still attached to the [[Command Module]] then the escape motor in the tower will be fired to pull the CM away from the Saturn stack, and then after the CM is in a stable situation the [[Earth Landing System]] will take over for an automated landing. | |||
==Earth Landing System== | ==Earth Landing System== | ||
Line 8: | Line 14: | ||
Since these events are irreversible and could be fatal if they occurred at the wrong time or didn't occur at the correct time, NASA went to a significant amount of trouble to ensure that the ELS couldn't be activated accidentally and would operate reliably when it was activated. | Since these events are irreversible and could be fatal if they occurred at the wrong time or didn't occur at the correct time, NASA went to a significant amount of trouble to ensure that the ELS couldn't be activated accidentally and would operate reliably when it was activated. | ||
==Controls== | |||
[[Image:CSM-SECS-Controls.jpg|thumb|250px|right|SECS logic switches and circuit breakers]] | |||
General SECS operation is controlled by switches and circuit breakers on Panel 8 in the Command Module. The logic controls are enabled by moving SECS LOGIC 1 ({{Panel label|name=A}}) and 2 ({{Panel label|name=B}}) from OFF to the up position. | |||
Main power for the SECS is enabled by the nearby SECS LOGIC A ({{Panel label|name=C}}) and SECS LOGIC B ({{Panel label|name=D}}) circuit breakers. | |||
<br clear="right"> | |||
==External Links== | ==External Links== | ||
* [http://history.nasa.gov/afj/aoh/aoh-v1-2-09-seqsys.pdf Apollo Operations Handbook: Sequential Systems] | * [http://history.nasa.gov/afj/aoh/aoh-v1-2-09-seqsys.pdf Apollo Operations Handbook: Sequential Systems] | ||
[[Category:Sequential Events Control Subsystem| ]] | |||
{{stub}} | {{stub}} | ||
Latest revision as of 18:27, 6 December 2006
The Sequential Events Control Subsystem (SECS) is responsible for controlling events which must happen in a pre-programmed sequence, for example parachute deployment during landing, or jettisoning the Service Module.
Launch Escape System
|{{#if:|, | and }}[[{{{2}}}|{{{2}}}]]}}{{#if: |{{#if:|, |, and }}[[{{{3}}}|{{{3}}}]]}}{{#if: |{{#if:|, |, and }}[[{{{4}}}|{{{4}}}]]}}{{#if:
|, and [[{{{5}}}|{{{5}}}]]}}{{#if: | (too many parameters in {{mainarticle}})}}
The Launch Escape System (LES) is responsible for returning the crew safely to Earth in the event of an abort during the launch. If the Launch Escape Tower is still attached to the Command Module then the escape motor in the tower will be fired to pull the CM away from the Saturn stack, and then after the CM is in a stable situation the Earth Landing System will take over for an automated landing.
Earth Landing System
|{{#if:|, | and }}[[{{{2}}}|{{{2}}}]]}}{{#if: |{{#if:|, |, and }}[[{{{3}}}|{{{3}}}]]}}{{#if: |{{#if:|, |, and }}[[{{{4}}}|{{{4}}}]]}}{{#if:
|, and [[{{{5}}}|{{{5}}}]]}}{{#if: | (too many parameters in {{mainarticle}})}}
The Earth Landing System (ELS) is responsible for the sequential events required to land the crew safely on Earth, for example jettisoning the apex cover and deploying the parachutes.
Since these events are irreversible and could be fatal if they occurred at the wrong time or didn't occur at the correct time, NASA went to a significant amount of trouble to ensure that the ELS couldn't be activated accidentally and would operate reliably when it was activated.
Controls
General SECS operation is controlled by switches and circuit breakers on Panel 8 in the Command Module. The logic controls are enabled by moving SECS LOGIC 1 (A) and 2 (B) from OFF to the up position.
Main power for the SECS is enabled by the nearby SECS LOGIC A (C) and SECS LOGIC B (D) circuit breakers.
External Links