Template:Prelaunch checklist: Difference between revisions
imported>Tschachim No edit summary |
imported>Tschachim No edit summary |
||
Line 137: | Line 137: | ||
<tr> | <tr> | ||
<td width="11%"> </td> | <td width="11%"> </td> | ||
<td width="48%" valign="top"><table width="100%" class="wikiembeddedtable"> | <td width="48%" valign="top"><table width="100%" class="wikiembeddedtable"><tr> | ||
<td colspan="2">V37E 00E</td> | <td colspan="2">V37E 00E</td> | ||
</tr> | </tr> | ||
Line 187: | Line 187: | ||
<td colspan="2">V37E 00E</td> | <td colspan="2">V37E 00E</td> | ||
</tr> | </tr> | ||
</table></td> | </table></td> | ||
<td valign="top" width="5%"><table width="100%" class="wikiembeddedtable"> | <td valign="top" width="5%"><table width="100%" class="wikiembeddedtable"> |
Revision as of 18:19, 18 October 2006
Procedural steps in this section are presented in tabular form and in sequence they occure during the mission. The following is a detailed explanation of the columnar data presented in the tabulated lists:
Time | This column contains the mission time the procedure is to be done. Sometimes there's no fixed time when to do a procedure, in that case the time is left out. |
Procedure | The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. You can use the panel reference if you need more informations about a certain display or control. Also the following abbreviations are used:
lt - light Additionally to use the DSKY the following abbreviations are used: V is short for VERB, N is short for NOUN, and E is short for ENTR. |
Panel | The panel number of a particular switch or display for easier panel navigation. |
Remarks | Any useful comment. Please notice especially differences to the original function, bugs or other issues. |
Spacecraft systems activation
In Project Apollo - NASSP the Saturn prelaunch checklist starts at 3 hours before launch with the backup crew in the spacecraft. At first some of the spacecraft's systems have to be activated.
Time | Procedure | Panel |
Remarks | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
-03:00:00 |
|
|
|
|||||||||||||||
|
|
Activation of the command module computer. |
{{ #if: |
|
|
|
|
|
|
Light test isn't historically correct.
(not historically correct). |
}}
|
|
Activation of the inertial |
Backup crew prelaunch checks
Bla
Test
{{ #if: |Virtual AGC |NASSP AGC }}
Test End
<biblio force=false>
</biblio>