Template:Prelaunch checklist: Difference between revisions
imported>Tschachim No edit summary |
imported>Tschachim No edit summary |
||
Line 9: | Line 9: | ||
|-valign="top" | |-valign="top" | ||
|'''Procedure''' | |'''Procedure''' | ||
|The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. | |The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. See [[CSM panels]] for more informations. | ||
|-valign="top" | |-valign="top" | ||
|'''Panel''' | |'''Panel''' |
Revision as of 18:51, 18 October 2006
Procedural steps in this section are presented in tabular form and in sequence they occure during the mission. The following is a detailed explanation of the columnar data presented in the tabulated lists:
Time | This column contains the mission time the procedure is to be done. Sometimes there's no fixed time when to do a procedure, in that case the time is left out. |
Procedure | The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. See CSM panels for more informations. |
Panel | The panel number of a particular switch or display for easier panel navigation. |
Remarks | Any useful comment. Please notice especially differences to the original function, bugs or other issues. |
Spacecraft systems activation
In Project Apollo - NASSP the Saturn prelaunch checklist starts at 3 hours before launch with the backup crew in the spacecraft. At first some of the spacecraft's systems have to be activated.
Time | Procedure | Panel |
Remarks | |||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
-03:00:00 |
|
|
|
|||||||||||||||
|
|
Activation of the command module computer. |
{{ #if: |
|
|
Run program P00
|
|
|
|
Light test isn't historically correct.
(not historically correct). |
}}
|
|
Activation of the inertial |
Backup crew prelaunch checks
C&WS status check
With the first procedure the caution and warning system is checkedAOH2.
Test
{{ #if: |Virtual AGC |NASSP AGC }}
Test End
<biblio force=false>
</biblio>