Template:Launch checklist: Difference between revisions

From Project Apollo - NASSP
Jump to navigation Jump to search
imported>Tschachim
No edit summary
imported>Tschachim
No edit summary
Line 572: Line 572:
</tr>
</tr>
<tr>
<tr>
<td>&nbsp;</td>
<td>&nbsp;</td>
</tr>
</tr>
<tr>
<td>This procedure only works with the Virtual AGC.</td>
</tr>
<tr>
<td>&nbsp;</td>
</tr>
<tr>
<tr>
<td>[[Image:Checklist_postorbit_scsattcheck.gif]]</td>
<td>[[Image:Checklist_postorbit_scsattcheck.gif]]</td>
Line 587: Line 579:
</table></td>
</table></td>
<td valign="top" width="7%"><table width="100%" class="wikiembeddedtable">
<td valign="top" width="7%"><table width="100%" class="wikiembeddedtable">
<tr>
<td>&nbsp;</td>
</tr>
<tr>
<td>&nbsp;</td>
</tr>
<tr>
<tr>
<td>&nbsp;</td>
<td>&nbsp;</td>
</tr>
</tr>
<tr>
<tr>
<td>&nbsp;</td>
<td>&nbsp;</td>
</tr>
</tr>
Line 607: Line 591:
<td><div align="center">DSKY</div></td>
<td><div align="center">DSKY</div></td>
</tr>
</tr>
<tr>
<tr>
<td><div align="center">1</div></td>
<td><div align="center">1</div></td>

Revision as of 19:36, 19 October 2006

When it's possible, the original Apollo documentation is used for the checklists. Steps, which are not possible at the moment, are denoted in grey. Additionally there are checklists in Word file format in the Doc\Project Apollo - NASSP\Check List directory of your installation. Procedural steps in this section are presented in tabular form and in sequence they occure during the mission. The following is a detailed explanation of the columnar data presented in the tabulated lists:

Apollo 15 launch checklistA15_LAUNCH_CHECK
Time This column contains the mission time the procedure is to be done. Sometimes there's no fixed time when to do a procedure, in that case the time is left out.
Procedure The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. See CSM panels for more informations.
Panel The panel number of a particular switch or display for easier panel navigation.
Remarks Any useful comment. Please notice especially differences to the original function, bugs or other issues.

At T+00:00:00 the Saturn launches automatically. The following tables show the historical launch sequence of Apollo 16AOH2, all other Saturn V missions are very similar. Only the Saturn 1b missions are different, because the Saturn 1b stage has only 2 stages, so there's only 1 staging event. {{ #if: | |

Attention
Please note that all DSKY interaction mentioned in the original documentation cannot be used in Standard mode with the NASSP AGC.

}}

Boost & insertion

{{ #if: | |

Attention
Please note that all DSKY interaction on the last 2 pages above cannot be used in Standard mode with the NASSP AGC. With the NASSP AGC just enter V37 N00E to go to program P00.

}}

Postorbital insertion checks

After SIVB engine cutoff (SECO) the spacecraft is in an almost circular earth orbit, called "Earth Parking Orbit" (EPO). Now the postorbital insertion checks have to be done.

Time Procedure
Panel
Remarks
00:12:00
Postorbital insertion checks
 
EDS PWR - OFF
MAIN BUS TIE (2) - OFF
SECS PYRO ARM (2) - SAFE
SECS LOGIC (both) - OFF
cb SECS ARM (2) - open
TRANS CONT PWR - OFF
ROT CONTR PWR DIRECT (2) - OFF
BMAG MODE (3) - RATE 2
LV STAGE sw - OFF (verify)
DIRECT O2 vlv - CLOSE
 
C/W NORM - NORM
 
FC REACS VLVS - NORM
H2 PURGE LINE HTR - ON
 
 
7
5
8
 
 
1
 
 
2
7
 
2
 
3
 


















Prepares the FC purge check.

SM RCS monitoring check

 
SM RCS monitoring check
 
SM RCS PRPLNT tb (8) - gray
SM RCS HELIUM 1/2 tb (8) - gray
 
 
2
 

C&WS operational check

 
C&WS operational check
 
 
A more detailed check is in the CSM Caution & Warning System
 
 
2
 




CM RCS lights not working yet.

ECS post insertion config

 
ECS post insertion config
 
PRIM GLY EVAP STM PRESS ind -
  0.09-0.14 psi
PRIM ACCUM QTY ind - 25-50 %
RAD FLOW CONT PWR - PWR
PRIM GLY TO RAD vlv - NORMAL (push)
RAD PRIM HTR - 1
ECS RAD tb - gray
GLY EVAP TEMP IN - AUTO
POT H2O HTR - MNA
 
 
2
 
 
 
325
2
 
 
 
CAB FAN (both) - on (up)
  O2 FLOW ind - 1.0 lb/hr
  O2 FLOW HI lt - on
  MASTER ALARM pb/lt - on, push
 
  O2 FLOW HI lt - off
  PRIM GLY EVAP OUT TEMP ind - 38-43 °F
  RAD PRIM OUT TEMP ind - below
    RAD PRIM IN TEMP ind
2
 
 
1
 
2

After a few minutes.



After a few minutes.

Fuel cell purge check

 
Fuel cell purge check
 
 
 
3
 
 

EPS monitoring check

 
EPS monitoring check
 
 
A similar check is in the CSM Electrical Power System.
 
   

ECS monitoring check

 
ECS monitoring check
 
 
A similar check is in the CSM Environmental Control System.
   

Secondary water-glycol loop check

 
Secondary water-glycol loop check
 
   

{{ #if: |=== SCS attitude reference check ===

 
SCS attitude reference check
 
 
 
 
DSKY
1
 

| }}

Extend docking probe

 
Extend docking probe
 
 
 
 
 
8
2
 

<biblio force=false>

  1. References

</biblio>