imported>Tschachim |
imported>Tschachim |
(One intermediate revision by the same user not shown) |
Line 1: |
Line 1: |
| When it's possible, the '''original Apollo documentation''' is used for the checklists. Steps, which are not possible at the moment, are denoted in grey. Additionally there are checklists in Word file format in the Doc\Project Apollo - NASSP\Check List directory of your [[installation]]. Procedural steps in this section are presented in tabular form and in sequence they occure during the mission. The following is a detailed explanation of the columnar data presented in the tabulated lists:
| |
|
| |
| [[Image:Apollo_15_launch_checklist.gif|thumb|right|Apollo 15 launch checklist<cite>A15_LAUNCH_CHECK</cite>]]
| |
|
| |
| {| class="wikitable"
| |
| |-valign="top"
| |
| |'''Time'''
| |
| |This column contains the mission time the procedure is to be done. Sometimes there's no fixed time when to do a procedure, in that case the time is left out.
| |
| |-valign="top"
| |
| |'''Procedure'''
| |
| |The procedure is a group of steps or overall tasks involved in performing a complete function or operation. It often consists of controls the astronauts have to toggle or display readings that have to be checked. See [[CSM panels]] for more informations.
| |
| |-valign="top"
| |
| |'''Panel'''
| |
| |The panel number of a particular switch or display for easier panel navigation.
| |
| |-valign="top"
| |
| |'''Remarks'''
| |
| |Any useful comment. Please notice especially differences to the original function, bugs or other issues.
| |
| |}
| |
|
| |
| At T+00:00:00 the Saturn launches automatically. The following tables show the historical launch sequence of Apollo 16<cite>AOH2</cite>, all other Saturn V missions are very similar. Only the Saturn 1b missions are different, because the Saturn 1b stage has only 2 stages, so there's only 1 staging event. | | At T+00:00:00 the Saturn launches automatically. The following tables show the historical launch sequence of Apollo 16<cite>AOH2</cite>, all other Saturn V missions are very similar. Only the Saturn 1b missions are different, because the Saturn 1b stage has only 2 stages, so there's only 1 staging event. |
| {{ #if: {{{VirtualAGC|}}} | | {{Attention | message=Please note that all DSKY interaction mentioned in the original documentation cannot be used in ''Standard mode'' with the NASSP AGC. }} | | {{ #if: {{{VirtualAGC|}}} | | {{Attention | message=Please note that all DSKY interaction mentioned in the original documentation cannot be used in ''Standard mode'' with the [[Simple AGC]]. }} |
| }} | | }} |
|
| |
|
Line 42: |
Line 23: |
| [[Image:Checklist_launch_boost9.gif]] | | [[Image:Checklist_launch_boost9.gif]] |
|
| |
|
| {{ #if: {{{VirtualAGC|}}} | | {{Attention | message=Please note that all DSKY interaction on the last 2 pages above cannot be used in ''Standard mode'' with the NASSP AGC. With the NASSP AGC just enter V37 N00E to go to program P00.}} | | {{ #if: {{{VirtualAGC|}}} | | {{Attention | message=Please note that all DSKY interaction on the last 2 pages above cannot be used in ''Standard mode'' with the [[Simple AGC]]. With the [[Simple AGC]] just enter V37 N00E to go to program P00.}} |
| }} | | }} |
| == Postorbital insertion checks == | | == Postorbital insertion checks == |
At T+00:00:00 the Saturn launches automatically. The following tables show the historical launch sequence of Apollo 16AOH2, all other Saturn V missions are very similar. Only the Saturn 1b missions are different, because the Saturn 1b stage has only 2 stages, so there's only 1 staging event.
{{ #if: | |
|
Attention
|
|
Please note that all DSKY interaction mentioned in the original documentation cannot be used in Standard mode with the Simple AGC.
|
}}
Boost & insertion
{{ #if: | |
|
Attention
|
|
Please note that all DSKY interaction on the last 2 pages above cannot be used in Standard mode with the Simple AGC. With the Simple AGC just enter V37 N00E to go to program P00.
|
}}
Postorbital insertion checks
After SIVB engine cutoff (SECO) the spacecraft is in an almost circular earth orbit, called "Earth Parking Orbit" (EPO). Now the postorbital insertion checks have to be done.
Time |
Procedure |
Panel |
Remarks |
00:12:00 |
Postorbital insertion checks |
|
EDS PWR - OFF |
MAIN BUS TIE (2) - OFF |
SECS PYRO ARM (2) - SAFE |
SECS LOGIC (both) - OFF |
cb SECS ARM (2) - open |
TRANS CONT PWR - OFF |
ROT CONTR PWR DIRECT (2) - OFF |
BMAG MODE (3) - RATE 2 |
LV STAGE sw - OFF (verify) |
DIRECT O2 vlv - CLOSE |
|
C/W NORM - NORM |
|
FC REACS VLVS - NORM |
H2 PURGE LINE HTR - ON |
|
|
Prepares the FC purge check.
|
SM RCS monitoring check
|
SM RCS monitoring check |
|
SM RCS PRPLNT tb (8) - gray |
SM RCS HELIUM 1/2 tb (8) - gray |
|
|
|
CWS operational check
ECS post insertion config
|
ECS post insertion config |
|
PRIM GLY EVAP STM PRESS ind - |
|
0.09-0.14 psi |
PRIM ACCUM QTY ind - 25-50 % |
RAD FLOW CONT PWR - PWR |
PRIM GLY TO RAD vlv - NORMAL (push) |
RAD PRIM HTR - 1 |
ECS RAD tb - gray |
GLY EVAP TEMP IN - AUTO |
POT H2O HTR - MNA |
|
|
|
|
CAB FAN (both) - on (up) |
|
O2 FLOW ind - 1.0 lb/hr |
|
O2 FLOW HI lt - on |
|
MASTER ALARM pb/lt - on, push |
|
|
O2 FLOW HI lt - off |
|
PRIM GLY EVAP OUT TEMP ind - 38-43 °F |
|
RAD PRIM OUT TEMP ind - below |
|
|
RAD PRIM IN TEMP ind |
|
|
After a few minutes.
After a few minutes. |
Fuel cell purge check
|
Fuel cell purge check |
|
|
|
|
|
EPS monitoring check
ECS monitoring check
Secondary water-glycol loop check
|
Secondary water-glycol loop check |
|
|
|
|
|
{{ #if: |=== SCS attitude reference check ===
|
SCS attitude reference check |
|
|
|
|
|
| }}
Extend docking probe
|
Extend docking probe |
|
|
|
|
|
<biblio force=false>
- References
</biblio>