Apollo 11: Difference between revisions

From Project Apollo - NASSP
Jump to navigation Jump to search
imported>Tschachim
No edit summary
imported>Tschachim
No edit summary
Line 21: Line 21:
|-valign="top"
|-valign="top"
| Trans Lunar Injection (TLI)
| Trans Lunar Injection (TLI)
| [[TLI_checklist_(Quickstart)|TLI checklist]]
| align="center" | -
|-valign="top"
| Transposition & Docking
| [[Transposition_&_Docking_checklist_(Quickstart)|Transposition & Docking checklist]]
| align="center" | -
|-valign="top"
| colspan="3" | To be continued...
|}
== Standard mode ==
The scenarios for an Apollo 11 Standard mode mission are in the '''Apollo - Historical Missions\Apollo 11''' folder. The following table shows the currently available mission phases together with the checklists to use:
{| class="wikitable"
! Mission phase
! Checklists
! Scenario
! Remarks
|-valign="top"
| Assembly
|
| Apollo 11 - Assembly
| {{ Under Construction | message=Assembly is out of service currently }}
|-valign="top"
| Rollout
|
| Apollo 11 - Rollout
|
|-valign="top"
| Prelaunch
|
| Apollo 11 - Launch
| Scenario starts 3h before lift-off.
|-valign="top"
| Launch & Earth orbit insertion
| -
| -
|
|
|-valign="top"
| Trans Lunar Injection (TLI)
| [[TLI_checklist_(Standard)|TLI checklist]]
|
|
| align="center" | -
|-valign="top"
|-valign="top"
| Transposition & Docking
| Transposition & Docking
| [[Transposition_&_Docking_checklist_(Standard)|Transposition & Docking checklist]]
|
|
|
| align="center" | -
|-
|-valign="top"
| colspan="3" | {{ Under Construction | message=... to be continued }}
| colspan="4" | To be continued...
|}
|}
== Standard mode ==
The scenarios for an Apollo 11 Standard mode mission are in the '''Apollo - Historical Missions\Apollo 11''' folder.




[[Category:Missions]]
[[Category:Missions]]

Revision as of 11:17, 16 October 2006

Apollo 11 was the first manned mission to land on the Moon. It was the fifth human spaceflight of the Apollo program, and the third human voyage to the moon. Launched on July 16, 1969, it carried Commander Neil Armstrong, Command Module Pilot Michael Collins and Lunar Module Pilot Edwin 'Buzz' Aldrin. On July 20, Armstrong and Aldrin became the first humans to land on the Moon, while Collins orbited above.

Quickstart mode

The Apollo 11 Quickstart - Launch scenario in the Project Apollo - NASSP folder starts a new Apollo 11 mission. The following table shows the currently available mission phases together with the checklists to use:

Mission phase Checklists Remarks
Prelaunch - Scenario starts 2h before lift-off, everything runs automatically. Use time acceleration up to 100 if you don't want to wait.
Launch & Earth orbit insertion - The Saturn is controlled by the autopilot. Time acceleration is reset to 1 at T-20s automatically, you should not use time acceleration until you reached Earth orbit.

At about T+12min Engine cutoff occurs, the spacecraft is in the almost circular Earth Parking Orbit (EPO). You can control the SIVB manually now.

Trans Lunar Injection (TLI) TLI checklist -
Transposition & Docking Transposition & Docking checklist -
To be continued...

Standard mode

The scenarios for an Apollo 11 Standard mode mission are in the Apollo - Historical Missions\Apollo 11 folder. The following table shows the currently available mission phases together with the checklists to use:

Mission phase Checklists Scenario Remarks
Assembly Apollo 11 - Assembly
Assembly is out of service currently
Rollout Apollo 11 - Rollout
Prelaunch Apollo 11 - Launch Scenario starts 3h before lift-off.
Launch & Earth orbit insertion - -
Trans Lunar Injection (TLI) TLI checklist -
Transposition & Docking Transposition & Docking checklist -
To be continued...