In Project Apollo - NASSP the Saturn prelaunch checklist starts at 3 hours before launch with the backup crew in the spacecraft. At first some of the spacecraft's systems have to be activated.
Time
Procedure
Panel
Remarks
-03:00:00
C/W system activation
C/W POWER - 1 (up)
MASTER ALARM pb/lt (3) - on,
push
2
The suit compressor alarm is normal.
CMC power up
cb G/N COMPUTER MNA - close
cb G/N COMPUTER MNB - close
5
Activation of the command
module computer.
{{ #if: |
V37E 00E
P00
If prog alarm, check if alarm code 1520
"V37 request not permitted at this time"
by V05N09E, then RSET and retry V37E 00E
V35E
F 88 88
V37E 00E
V16 N65E
16 65
V37E 00E
2
Run program P00
This can happen every V37 request.
Light test
Shows time since power-up,
check time synchronization
with Orbiter.
|
Wait until DSKY light test complete
STBY lt - on
PRO
STBY lt - out
Key N00E
P00
NO ATT lt - on
Key V34E
Key V16 N33E
2
Light test isn't historically correct.
Run program 0,
the AGC idling program.
IMU is not turned on.
Show launch countdown (not historically correct).
}}
IMU power up
cb G/N IMU HTR MNA - close
cb G/N IMU HTR MNB - close
cb G/N IMU MNA - close
cb G/N IMU MNB - close
{{ #if: |NO ATT lt - on (90 sec) |NO ATT lt - off }}
{{ #if: |NO ATT lt - off | }}
5
2
Activation of the inertial measurement unit.
Backup crew prelaunch checks
C&WS status check
With the first procedure the caution and warning system is checkedAOH2.
Glycol loop checks
Next the primary and secondary water-glycol coolant loops are checked and the primary water-glycol coolant loop is activated. The grey lines indicate displays or controls which are not available at the moment, please ignore these steps.
Standby inverter checks
Time
Procedure
Panel
Remarks
C/W NORM - BOOST
2
This is not mentioned in the Apollo Operations HandbookAOH2, but otherwise the C/W lights during the inverter check won't work.
Panels checks
Next some checks regarding the panel displays and controls have to be done and a few but very important devices have to be turned on. We begin at panel 325, which is to the left of the left side panel.
Time
Procedure
Panel
Remarks
PRIM GLY TO RAD vlv - NORM
325
AUTO RCS (16) - OFF
SECS LOGIC (both) - OFF
SECS PYRO ARM (2) - SAFE
cb pnl 8 - all closed except
cb CM RCS HTRS (both) - open
cb FLOAT BAGS (all) - open
cb SECS LOGIC (2) - open
cb SECS ARM (2) - open
8
EDS PWR - OFF
TVC SERVO PWR (both) - OFF
FDAI/GPI POWER - BOTH
LOGIC 2/3 PWR - on (up)
ELEC PWR - GDC/ECA
SIG CONDR/DR BIAS PWR (both) - AC1 or AC2
BMAG PWR (both) - WARMUP
7
Turn on both FDAIs.
Turn on GDC and ECA.
Powers RJ/EC. Switches should
not be set on same bus.
These are the nominal values
for a 72° launch azimuth.
Guarded.
Guarded.
Guarded.
Guarded.
Switch to α.
Event timer not counting. Timer resets and starts automatically when lift-off occurs.
SUIT CAB ΔP ind - > + 2.0 inH2O
O2 FLOW ind - 0.4 ± 0.1 lb/hr
PROBE EXTD/REL tb (2) - gray
PROBE (3) - OFF
RCS status check
SM RCS He 1 tb (4) - bp
SM RCS He 2 tb (4) - bp
SM RCS PRIM PRPLNT tb (4) - bp
SM RCS SEC PRPLNT tb (4) - bp
EDS AUTO - OFF
CSM/LM FNL SEP (both) - off (down)
CM/SM SEP (2) - off (down)
SIVB/LM SEP - off (down)
PRPLNT DUMP - AUTO
2 ENG OUT sw - AUTO
LV RATES sw - AUTO
TWR JETT (both) - AUTO
LV GUID sw - IU
LV STAGE - OFF
XLUNAR INJECT - INJECT
MN REL - off (down)
2
Gray indicates probe fully
extended or retracted.
Barber pole indicates
valves are closed.
Guarded.
Guarded.
Guarded.
Guarded.
Guarded.
Guarded.
Guarded.
FC 1 PUMPS - AC1
FC 2 & 3 PUMPS - AC2
MN BUS TIE (2) - OFF
BAT CHGR - AC1
cb pnl 5 - all closed
5
GLY PUMPS - 1 AC1
SUIT COMPR (both) - OFF
cb pnl 4 - all closed
4
Prelaunch alignment
Now the prelaunch programs of the CMC are started, the DSKY is used for that. During prelaunch the IMU platform, also called stable member (SM), is aligned to launch position.
{{ #if:
|
Time
Procedure
Panel
Remarks
Start program P01
Key V37E 01E
NO ATT lt - on
Course align IMU
NO ATT lt - off
Change to P02
2
After starting P01 "Prelaunch or service initialization program" the IMU changes to course align mode and drives the stable member to prelaunch position.
Then it changes automatically to P02 "Prelaunch or service gyro compassing program". Because the AGC commands during P02 are very small you can't see them at the FDAI, but you can monitor the IMU gimbal angles with V16 N20E.
Optional check/change of launch azimuth
Key V78E
F 06 29
R1: Launch azimuth
To proceed press PRO, to change:
Key V21E
F 21 29
Key +XXXXXE
F 06 29
Key PRO
Pulse gyros...
The AGC did a prelaunch alignment for the launch azimuth as it is stored in the scenario. If you like, you can check or change it. This is done with verb 78, the DSKY shows the present launch azimuth. Press PRO to continue without changing, with verb 21 you could "load component 1 into R1" and change the launch azimuth in the format +XXX.XX°. Press PRO to confirm the new setting. Press CLR to clear a wrong input.
... to new launch position.
After pressing PRO the AGC changes the attitude of the stable member with gyro pulses to the new launch azimuth.
|
Time
Procedure
Panel
Remarks
Start program P01
Key V37 N01E
NO ATT lt - on
NO ATT lt - off
2
Start P01 "Prelaunch or service initialization program".
Change to P02
F 06 29
PRO
Verb 06, noun 29 shows the desired launch azimuth in format XXX.XX°, press PRO to confirm.
F 06 44
PRO
Noun 44 shows shows in R1 the desired apoapsis and in R2 the periapsis altitude, both in format XXXX.X m, press PRO to confirm.
F 06 33
Key V16E
16 33
Noun 33 shows time to lift-off, hours in R1, minutes in R2 and seconds in R3. Verb 16 monitors the countdown, that means the DSKY updates the time every 2 seconds. (not historically correct)
}}
The computer and the IMU are running and ready for launch.
Prime Crew Ingress/Cabin Closeout
Now the spacecraft is ready for prime crew ingress and cabin closeout. In real Apollo prime crew ingress began at T-02:40:00 and ends with closing the hatch at T-01:40:00. In between the prime crew did a lot of checks similar to the backup crew checks above.
In Project Apollo - NASSP as a simplification both events happen simultaneously and take place at T-01:40:00, the prime crew checks are left out. If you use time acceleration the simulation slows down automatically at that time and some audio of the prelaunch is played. Please make sure that you do the following steps directly or shortly after T-01:40:00.
Time
Procedure
Panel
Remarks
-01:40:00
Prime crew ingress and cabin closeout
C/W NORM - NORM
DIRECT O2 vlv - OPEN, adj for
O2 FLOW ind - 0.6-0.8 lb/hr
SUIT COMPR 1 - AC1
SUIT COMPR lt - out
SUIT COMPR ΔP 0.7-0.9 psi
SUIT CAB ΔP ind - > +2.0 inH2O
SUIT H2O ACCUM AUTO - 1
Verify P02
2
7
2
4
2
After about 10 minutes.
Final verification & system checks
Now the prime crew continues with the final system checks before launch. At the beginning the BMAGs (Body Mounted Attitude Gyro) are turned on, the FDAIs and the GDC (Gyro Display Coupler) are checked and the GDC is aligned to the reference attitude for a typical launch azimuth.
G&C verification
The CSM has 2 independent devices, which provide an inertial attitude reference, the IMU and the GDC by using the BMAGs. The IMU was aligned by P01/P02, now the GDC is aligned. The FDAI and ASCP articles explain the displays and controls, which are used for that. The GDC ALIGN pushbutton stores the attitude currently set in the ASCP in the GDC, so with that you can change the GDC attitude manually and this is done in the following.
Main bus activation
Now the main bus supply is configured for flight. During prelaunch and up to now the main bus power is supplied by the GSE (Ground Support Equipment), only Fuel Cell 2 is connected with Main Bus A. GSE is disconnected at T-15 min, so we have to power both buses with the fuel cells before that.
Time
Procedure
Panel
Remarks
Main bus activation
FC MNA 1 & 2 - up, 3 - OFF
FC MNA 1 & 2 tb - gray, 3 tb - bp
FC MNB 1 & 2 - OFF, 3 - up
FC MNB 1 & 2 tb - bp, 3 tb - gray
3
Up position is momentary.
Up position is momentary.
FDAI verification
Next the FDAIs are set in flight configuration, the GDC attitude is aligned to the IMU attitude.
Pad abort enable
Now the pyros and sequential systems are armed.
SM RCS activation
Last the SM RCS is activated, please note that most of the RCS displays and controls are not working yet.
Time
Procedure
Panel
Remarks
-00:25:00
SM RCS activation
SM RCS HELIUM 1 (4) - OPEN
SM RCS HELIUM 1 tb (4) - gray
SM RCS HELIUM 2 (4) - OPEN
SM RCS HELIUM 2 tb (4) - gray
SM RCS PROPELLANT (4) - OPEN
SM RCS PRIM PRPLNT tb (4) - gray
SM RCS SEC PRPLNT tb (4) - gray
2
Launch preparation
These are the last checklist actions before lift-off.
{{ #if: | |
Attention
Please note that all DSKY interaction mentioned in the original documentation cannot be used in Standard mode with the NASSP AGC.